UGMK-Holding and CINF (China) have carried out the fourth round of negotiations on designing and construction of a new zinc electrolysis shop at Electrozinc in the city of Vladikavkaz, which will produce 96 thousand tons of zinc and zinc-aluminum alloy per year.
This year Electrozinc will finish the project and design work on construction.
“We have decided on the location of the main machinery of the electrolysis shop, induction furnaces, etc,” the works construction director Alexander Shtyurts noted.
The new shop will replace the current one with the capacity of 110 thousand tons per year in order to decrease environment impact. (Ukrainian metal)