In 2017 Electrozinc, a part of UMMC, will continue shipping dump clinker for processing at the industrial enterprises of Ural.
According to the agreements, the volume of product, received in the process of zinc manufacture, will increase from 21.9 thousand tons in 2016 to 32 thousand tons.
Since the year-start over 1 thousand tons of clinker has already been shipped.
The total volume of clinker shipments in 2016 was 104.4 thousand tons. In 2017 it is planned to sell 110 thousand tons. (Ukrainian metal)