The state enterprise Vostochniy Mining and Processing Works has concluded two contracts with Temp LLC for the transportation of the uranium ore valued at 33.21 million UAH.
This year 96 thousand tons of ore should be transported from the Novokonstantinovskaya mine to the Smolinskaya mine and the same volume of inert materials back; as well as 130 thousand tons of ore to Ingulskaya mine and 38 thousand tons of inert materials back. (Ukrainian metal)