Skip to content
The Ukrainian Metal
All about metal in Ukraine and World
The Ukrainian Metal
  • Ukraine. Metal. Database
  • Our partners
  • Ukraine. Metal. Database
  • Our partners

Category Archives: Kyshtym Electrolytic Copper Plant

Russia: KMEZ finishes copper electrolyses shop modernization

Kyshtym Electrolytic Copper PlantBy admin28.02.2018Leave a comment

Kyshtym Electrolytic Copper Plant has finished assembling two rows of baths (40 baths each) in the copper electrolyses shop. The final stage of the modernization project was the assembly of power network. To connect the new baths to the grid the whole manufacturing process had to be suspended for 10 hours. In April the company…

Russia: KMEZ cathode copper output up in 2017

Kyshtym Electrolytic Copper PlantBy admin24.01.2018Leave a comment

In 2017 Kyshtym Electrolytic Copper Plant reached a new manufacturing record – it produced 129 thousand tons of copper cathodes, up by 5% YoY. This was mostly the result of raw copper manufacture growth at Karabashmed, which supplied KMEZ with raw materials. Thus, in 2017 the works produced 120 thousand tons of copper, up by…

Russia: KMEZ selenium output up in 2017

Kyshtym Electrolytic Copper PlantBy admin19.12.2017Leave a comment

In 2017 Kyshtym Electrolytic Copper Plant is expecting to produce the record 57 tons of selenium. The previous record of 48.3 tons of selenium was achieved in 2014. The increase in output is due to the complete transfer of the company to Karabashmed raw materials, and the manufacture grew from 4.8 tons per months to…

Russia: KMEZ to assemble new gas-purifying equipment

Kyshtym Electrolytic Copper PlantBy admin08.12.2017Leave a comment

Kyshtym Electrolytic Copper Plant will assemble a new complex on MAERZ furnace gas purifying valued at 200 million rubles. Purification will reach 99%, and the total square of filtration will be 4.5 thousand square meters. The new gas-purifying equipment will be commissioned in H2 2018. (Ukrainian metal)

Russia: KMEZ assembles new electrolysis baths

Kyshtym Electrolytic Copper PlantBy admin17.11.2017Leave a comment

Kyshtym Electrolytic Copper Plant has finished the assembly of two additional rows of electrolysis baths within the program to increase copper cathode capacities. Each row includes 40 ferroconcrete baths. The project will increase cathode output by 16.7%, to 140 thousand tons per year. Investments in the modernization are estimated at 420 million rubles. (Ukrainian metal)

Russia: KMEZ pondering new modernization projects

Kyshtym Electrolytic Copper PlantBy admin09.11.2017Leave a comment

Kyshtym Electrolytic Copper Plant intends to continue modernization. In particular, the company wants to completely switch to electrolysis bathes made of polymer concrete. This material is long lasting (up to 25 years), resilient and easy to use. “Now the copper electrolysis shop has ferroconcrete bathes. Every 5 years they need their lining replaced, and every…

Russia: KMEZ cathode output up in January-September 2017

Kyshtym Electrolytic Copper PlantBy admin02.11.2017Leave a comment

The Kyshtym Copper Electrolytic Plant (Kyshtym, Chelyabinsk region, a subsidiary of the Russian Copper Company) has released its production results for the first 9 months of 2017. During that time, the plant produced over 97,128 tons of cathodes, up by 8.6% YoY. Copper rod production increased by 6.1%, to 72,784 tons, silver by 2.3% and…

Russia: KMEZ copper output up in January-September 2017

Kyshtym Electrolytic Copper PlantBy admin09.10.2017Leave a comment

In January-September Kyshtym Electrolytic Copper Plant produced 97127.8 tons of copper cathodes, up by 8.6% YoY. Copper wire rod output went up by 6.1%, to 72.784 tons, silver – by 2.3%, gold – by 30%. “This year we intend to produce 128 thousand tons of copper cathodes, up by 5% YoY”, the company CEO Andrei…

123456
Go to Top