In January-February, Almalyk Mining and Processing Works exceeded output by 11.3% from the forecast.
Increase in copper cathodes production reached 2.4%, with own raw materials – 24.2% and zinc of own raw materials – 4.1%.
Polymetallic ore output target was reached in full, while its processing exceeded it by 0.1% and zinc content in concentrate – by 0.4%. (Ukrainian metal)