Sukha Balka has commissioned a new block at the Yuvileyna mine.
The volume of the block is 73 thousand tons.
The new block is situated at the depth of 1420 meters in unstable rock. This required special anchoring.
Operation of the mine was resumed in April, when the lack of experienced personnel was overcome. (Ukrainian metal)