Employees of the Ingulets Mining and Processing Works have constructed a new crossing over the Ingulets River in the Shirokoye settlement.
The crossing was damaged as a result of the Russian missile attack on Krivoy Rog hydrostructures – a large volume of water from the Karachunovskoye reservoir got into the river resulting in destruction and flooding.
“Taking care of the local population, InGOK quickly started reconstructing the crossing. The specialists from the quarry and service maintenance shop disassembled the remnants of the damaged crossing and the foundation to increase the watercourse throughput and prevent housing flooding,” the company said.
After that pipes for water prepared in the technical water and slurry shop were installed, as well as ferroconcrete surface and railing. (Ukrainian metal)