The Ingulets Mining and Processing Works has started repairing the drum of the wet magnetic separation mill No. 11 at the ore-processing factory No. 2.
The repair will improve the efficiency of the mill and provide for its faultless operation.
InGOK, as other Metinvest GOKs, is operating at 30-40% of its design capacity due to logistics limitations. After the Russian invasion, the Ukrainian business cannot use seaports. (Ukrainian metal)