Mariupol Ilyich Iron and Steel Works has started a capital repair of its blast furnace No. 2.
The repair will last for 15 days and will cost 57.7 million UAH.
Earlier gas-purifying equipment was assembled at the blast furnace No. 3. (Ukrainian metal)