The Ukrainian Metal

Uzbekistan: Angrena Pipe Works output up in January-February 2020

As of March 17, Angrena Pipe Works, operating in the Angrena Free Economic Zone, produced 1056.8 tons of copper pipes, up by 6% from the target (996.8 tons).

The works was commissioned in 2013.

The design capacity of the enterprise is 8 thousand tons per year.

The main raw materials – cathode copper with the main metal content of 99.99% – are supplied from Almalyk Mining and Processing Works.

The company exports 85% of its pipes. (Ukrainian metal)

Exit mobile version