The construction site of the Udokan Mining and Metallurgical Works has received the first batch of embedded parts for the Outotec machinery.
The parts are needed to assemble the machinery used in the floatation and hydrometallurgical system of ore processing.
In particular, the new parts will be used in ball mills. The mills themselves will be delivered in April. (Ukrainian metal)