Zlatoust Electrometallurgical Works is preparing to commission the fifth Bosio heat treatment furnace.
The construction of a new heat treatment site on the basis of the rolling shop No. 3 has become a part of a large-scale project to unite all processes of metal treatment in one shop. Having commissioned Bosio furnaces in September 2019, ZEMZ was able to stop using a part of its heat treatment machines.
Average monthly output of each of the 5 new furnaces is 900 tons. (Ukrainian metal)