Amur Minerals intends to prepare a feasibility study for the Kun-Manye project until December 1, 2020.
It will be based on the pre-feasibility study made in February.
The Kun-Manye deposit was divided into three sites: Maliy Kurumka/Flangovy, Vodorazdelniy and Ikenskoye/Sobolevskoye/Kubuk.
The company intends to extract ore from 4 quarries and 1 mine.
At present the JORC reserves are estimated at 155.1 million tons of ore. Nickel contents could reach 1.58 million tons. (Ukrainian metal)