The heating furnace No. 4 has been shut down for capital repairs in the sheet-rolling shop-3000 of the Mariupol Ilyich Iron and Steel Works.
The cost of the repairs will reach 10.5 million UAH ($410 thousand).
As the result the furnace energy efficiency will meet the best world standards.
The repair will last for 105 days. (Ukrainian metal)