The Ukrainian Metal

Russia: 9 thousand tons of metal structures used to construct bridge in Samara

The builders of the Frunze bridge in the city of Samara have finished laying concrete of the roadway plates.

The laying started in December 2018.

The builders used nearly 5 thousand cubic meters of concrete and 9 thousand tons of metal structures.

The automobiles were allowed to cross the bridge starting from August 1, and trolleybuses will run from September 1. (Ukrainian metal)

Exit mobile version