Rusal intends to announce the end of the construction of the Boguchansky Aluminum Works first stage in late March.
The second line of the first stage will increase the enterprise capacity 2-fold, to some 300 thousand tons.
BoAZ is being constructed by Rusal together with Rushydro. The first line with the capacity of 150 thousand tons has been operating since 2016. (Ukrainian metal)