Severstal Steel Decisions has finished supplying metal structures for the construction of Kola Iron and Steel Company objects.
The total weight of the structures was 825 tons.
“So far this is one of the northernmost projects fulfilled by the company”, director Denis Chetverikov said.
All the metal structures are covered with corrosion-resistant coating and the surface of the structures with the size of 9 thousand square meters is plated with fire-resistant coating. (Ukrainian metal)