The Ukrainian Metal

Russia: BAZ ships first batch of products mastered with parallel projection

Blagoveschensk Rebars Works has made the first delivery of products mastered in record-low time thanks to the use of the innovative method of parallel projection.

The manufacture of new sizes of block valves DN 500 mm PN 6.3 MPa, DN 400 mm PN 6.3 MPa and DN 350 mm PN 10.0 MPa was mastered in just 120 days.

Usually it takes a year to master the manufacture of such products. (Ukrainian metal)

Exit mobile version