Electrocable has supplied 70 km of cable for the construction of the second stage of UGMK-Agro greenhouse complexes.
The total volume of deliveries, including for the first stage, reached 400 km.
The construction of the first stage ended in 2017. The second 5-generation greenhouse with the area of 6.8 ha will have been commissioned by the end of the year. (Ukrainian metal)