MMK-Metiz has commissioned a new machine to produce ropes and wire.
The first stage of the machine will produce high-carbon wire and steel ropes with the total capacity of over 43 thousand tons per year.
The cost of the project is 1.5 billion rubles.
The second stage will be commissioned in Q4. (Ukrainian metal)