The Ukrainian Metal

Russia: Gaysky GOK building underground crushing line

The specialists of the mine department of Gaysky Mining and Processing Works are busy constructing a crushing-conveyer line at the depth of 1095 meters.

The line, bearing the number of 11, upon completion will be connected to other two lines.

At present the Metco crusher is being assembled.

The length of the conveyer belt will be 250 meters. (Ukrainian metal)

Exit mobile version