Ormet has received the right to put into operation the first stage of the Djusinsky ore deposits.
The project capacity of the mine is 220 thousand tons of ore per year.
Investments in the first stage of the project totaled 2.4 billion rubles.
Ormet obtained the license to develop the mine in 1999. In 2004-2014 the deposit was developed in the open-pit mode, having produced over 7 million tons of ore.
In 2013 the underground mine construction began. (Ukrainian metal)