In 2018 Vysochaishiy (GV Gold) intends to produce up to 3 tons of gold at the Taryn Mining and Processing Works at the Drazhnoye deposits in Yakutia.
The factory started operating in May and already reached project output. In 2017 it is expected to process 530 thousand tons of ore with the average gold content of 3.72 g per ton. The total gold output will reach 1.8 tons (57 thousand ounces).
The capacity of the Taryn GOK factory first stage is 700 thousand tons of ore per year.
In 2016 Vysochaishiy obtained 163.8 thousand ounces of gold. (Ukrainian metal)