In the next 6 months miners of DTEK Space Heroes Mine Group will be mining coal from two new long faces, the combined reserves of which are estimated at 700 thousand tons.
Investment in the long faces amounted to 93.9 million UAH.
The average daily output of the long face 116 is 1697 tons of coal, and of long face 148 – 2012 tons.
“Our miners will be extracting coal from the 116 long face till late April, and from the 148 face till mid-June 2018”, the mine group deputy director on manufacture Sergey Faraonov believes. (Ukrainian metal)