The Ukrainian Metal

Ukraine: AMKR to reconstruct sinter shop for $150 million

ArcelorMittal Kriviy Rih is carrying out a reconstruction of its sintering machine No. 5 premises and buildings.

In particular, it is planned to assemble a dust exhaust system and replace gas-purifying equipment. The work is carried out under the sinter shop No. 2 modernization program.

The cost of the sinter shop No. 2 reconstruction is over $150 million. There are 6 sintering machines in the shop. (Ukrainian metal)

Exit mobile version