Oskol Electrometallurgical Works is going on with its large-scale investment project – the construction of the reducing-sizing mill in its bar-rolling shop No. 2.
Investments total 800 million rubles, and the output of rolled metal will as the result of the modernization increase by 67 thousand tons per year.
The main and auxiliary machinery has already been assembled, and is now being tested.
The shop No. 2 did not stop operating during the modernization. (Ukrainian metal)