Volnogorsk Mining and Metallurgical Combine has ordered the Imex Minerals LLC services on its territory and on the East site of Malyshev deposits valued at 42.86 million UAH.
The auxiliary machines services will cost 30.58 million UAH this year.
12.29 million UAH will be spent on removing a layer of soil (350 thousand cubic meters) and transporting it 0.1-2.5 km away.
The combine was able to save 0.07% of the total cost on the first tender and 12% on the second. (Ukrainian metal)