On July 27 Dneprovsky Iron and Steel Combine resumed steel smelting in its converter shop.

The first smelting was carried out at the continuous casting machine.

The blast furnace shop is expecting concentrate and sinter ore delivery. The blast furnace No. 9 is being blown. (Ukrainian metal)

Leave a Reply