By 2020 Almaznaya mine of DTEK Dobropolyeugol intends to mine 1.5 million tons of coal per year.

At present the enterprise is preparing to put a new line into operation. And a new conveyer, produced by Corum, will be installed there.

The length of the conveyer is 260 meters. A similar one has been operating at the enterprise for 8 years. (Ukrainian metal)

Leave a Reply