Kyshtym Electrolitic Copper Plant has prepared a site for the construction of two additional rows of electrolyses bathes (40 bathes in each row).

All the unnecessary equipment has been disassembled. The next stage is creation of the foundation.

The KMEZ copper electrolyses shop capacity will increase from 120 thousand tons to 140 thousand tons of copper cathodes per year.

Investments in the project total 380 million rubles. (Ukrainian metal)

Leave a Reply