Designers from Uralmekhanobr have completed the documentation for the third stage of the copper electrolysis shop at Uralelectromed with the increase of cathode capacity to 400 thousand tons per year.

“As to the machinery, automatization level, environment safety, and labor conditions the new shop meets all the modern world standards”, the project chief engineer Konstantin Syskov noted. (Ukrainian metal)

Leave a Reply